Cover of the study “Development of a capacity mechanism for the German electricity market”. The picture shows wind turbines and solar panels in the foreground and an electricity pylon in the background. The text at the bottom of the cover indicates that the study was commissioned by Amprion GmbH, TenneT TSO GmbH, 50Hertz Transmission GmbH and TransnetBW GmbH and was published in May 2024.

© consentec and Ecologic Institute 2024

Print

Ausarbeitung eines Kapazitätsmechanismus für den deutschen Strommarkt

Publication
Citation

Consentec GmbH and Ecologic Institut (2024): Ausarbeitung eines Kapazitätsmechanismus für den deutschen Strommarkt. Aachen and Berlin: Consentec GmbH and Ecologic Institut.

The final report of the study by Consentec and Ecologic Institute deals with the development of a capacity mechanism for the German electricity market. The need for a capacity mechanism is discussed against the background of the increasing share of renewable energies and the decline in conventional power plants and is intended to ensure security of supply, especially in view of the expected increase in electricity consumption and geopolitical uncertainties that may require short-term market interventions. The focus of the considerations is on the development of a comprehensive, centralized capacity market and selected related balancing issues.

Design options for a large-scale capacity market

The report outlines the key elements of a large-scale capacity market from the authors' perspective, which includes all types of capacity, including generation, storage and load management capacity. Important aspects include the conditions for participation in the capacity market, de-rating, demand assessment and the inclusion of a local dimension.

The analysis refers to existing capacity markets in other EU countries and the UK, in particular Belgium, which was the first EU country to introduce a comprehensive capacity market in accordance with the new Electricity Market Regulation.

Legal assessment

The legal analysis, conducted under the responsibility of Ecologic Institute, is also central. It focuses on clarifying the legal framework and requirements that are relevant for the introduction of a capacity mechanism and specifically a capacity market in Germany. In particular, this includes the legal requirements in accordance with the Electricity Market Regulation and EU state aid law. The study also addresses mechanisms designed to incentivise the construction of new controllable generation capacity (e.g. the so-called ‘new build advance’). 

The study and final report were compiled on behalf of the four transmission system operators (TSOs) Amprion GmbH, TenneT TSO GmbH, 50Hertz Transmission GmbH and TransnetBW GmbH. They were prepared mainly in the period from May 2022 to December 2022. Therefore, more recent energy industry discussions, e.g. regarding the BMWK's platform for a climate-neutral electricity system, which was launched in February 2023, are not yet included. However, the main features of the results presented in this report are unaffected by such issues or more recent developments.


 

A large-scale capacity market secures Germany's electricity supply, promotes investment and adapts to international best practices.

Contact

More content from this project

Language
German
Funding
Published by
Year
Dimension
43 pp.
Project
Project ID
Table of contents
Keywords
EU, electricity grid, energy system, security of supply, energy transition, energy policy, capacity planning, energy efficiency, energy capacity, energy supply, grid stability, energy trading, market mechanism, electricity generation, energy reserves, load management, storage technologies, electricity market, balancing energy, grid management, sustainable energy, renewable energy integration, electricity demand, electricity grid operators, energy industry, energy market regulation
Germany, Belgium, United Kingdom, Europe, Italy, Poland, Northern America, Northern Germany, Southern Germany
Probabilistic models, de-rating factors, Monte Carlo simulations, European Resource Adequacy Assessment, ERAA, seasonal and prospective analyses, flow-based models, deep dives, demand dimensioning